Resources & Support

The Documents and Support Your Team Needs to Move Forward.

Find current product files, compatibility information, compliance documents, installation guidance and service contacts in one place.

Engineers reviewing site data and energy storage project documents

Document status

All documents carry version and date metadata

Document library

Current and archived files.

Every document shows version, publish date, applicable market and language. Superseded files are retained for reference but clearly marked.

Current Compatibility

Battery-Inverter Compatibility List

Model
All
Market
Global
Language
EN
Version
v4.1
Published
2026-02-01
Size
1.1 MB
Current Brochure

MOLETONG 2026 Company and Product Brochure

Model
All Products
Market
Global
Language
EN
Version
v2.1
Published
2026-01-15
Size
8.4 MB
Current Datasheet

Home Energy Product Catalog

Model
HES Series
Market
Global
Language
EN / ZH
Version
v3.0
Published
2025-11-20
Size
5.1 MB
Current Datasheet

C&I Energy Storage Product Catalog

Model
CIS Series
Market
Global
Language
EN
Version
v2.4
Published
2025-10-08
Size
6.7 MB
Current Datasheet

Containerized ESS Product Overview

Model
CESS-5MWh
Market
Global
Language
EN
Version
v1.8
Published
2025-09-01
Size
4.2 MB
Current Datasheet

Three-Phase Hybrid Inverter Datasheet

Model
TPH-30K / TPH-50K
Market
EU / AU
Language
EN
Version
v2.0
Published
2025-08-20
Size
3.5 MB
Current Communication & EMS

HMS/EMS Overview

Model
HMS-Pro / EMS-G2
Market
Global
Language
EN
Version
v1.5
Published
2025-08-14
Size
3.0 MB
Current Installation Guidance

Single-Phase Hybrid Inverter Installation Manual

Model
SPH-5K / SPH-8K
Market
EU / AU
Language
EN / DE / FR
Version
v2.2
Published
2025-05-22
Size
7.8 MB
Current Project Data Template

C&I Site Data Checklist

Model
CIS Series
Market
Global
Language
EN
Version
v1.2
Published
2025-07-30
Size
0.4 MB
Current Project Data Template

Indonesia EaaS Eligibility Checklist

Model
All
Market
Indonesia
Language
EN / ID
Version
v1.0
Published
2025-06-10
Size
0.3 MB
Current Communication & EMS

Stick Logger Quick Setup Guide

Model
SL-100
Market
Global
Language
EN / ZH
Version
v1.3
Published
2025-04-15
Size
1.8 MB
Superseded Installation Guidance

Single-Phase Hybrid Inverter Installation Manual (Legacy)

Model
SPH-5K / SPH-8K
Market
EU
Language
EN
Version
v1.9
Published
2024-11-01
Size
7.1 MB

Public datasheets and brochures are available without registration. Controlled drawings, protocols and commercial documents may require project identification or a non-disclosure agreement.

Certification center

Model-level compliance, not blanket claims.

Filter by product model, target market and certification standard to verify which certificates apply to your specific unit. Each entry shows the issuing body, certificate number, applicable models and validity date.

Filtering...
Model Market Standard Certificate No. Issuer Entity Valid Until Scope
SPH-5K / SPH-8K EU CE CE-2024-MT-0012 TÜV Rheinland MOLETONG Energy Systems 2027-03-31 Low Voltage Directive, EMC
SPH-5K / SPH-8K AU RCM RCM-AU-MT-0034 SAA MOLETONG Energy Systems 2026-12-31 AS/NZS 4777.2
TPH-30K / TPH-50K EU CE CE-2024-MT-0019 TÜV Rheinland MOLETONG Energy Systems 2027-06-30 Low Voltage Directive, EMC
HES Series EU CE CE-2025-MT-0028 SGS MOLETONG Energy Systems 2028-02-28 Battery Safety, EMC
HES Series Global IEC 62619 IEC-MT-2025-007 Bureau Veritas MOLETONG Energy Systems 2028-05-31 Lithium Battery Safety
CIS Series EU CE CE-2024-MT-0031 TÜV SÜD MOLETONG Energy Systems 2027-09-30 Machinery Directive, EMC
CESS-5MWh Global IEC 62933 IEC-MT-2025-022 DNV MOLETONG Energy Systems 2028-10-31 Grid-Scale ESS Performance
CESS-5MWh Indonesia SNI SNI-ID-MT-0008 BSN Indonesia PT MOLETONG Indonesia 2026-11-30 National Standard Indonesia
SL-100 Global FCC FCC-MT-2024-SL1 FCC MOLETONG Energy Systems 2027-04-30 Radio Frequency Emissions

Project support workflow

From first question to ongoing operation.

Each stage has a defined contact window. Use the support form to route your request to the right team.

01

Pre-Sales Technical Question

System sizing, compatibility, tariff analysis, transformer capacity, inverter selection and application suitability.

Responsibility window

Technical Sales

Submit via support form -- select Pre-Sales Inquiry.

02

Document Request

Controlled drawings, protocol specifications, NDA-required materials and project-specific documentation.

Responsibility window

Engineering Team

Submit via support form -- select Document Request. Include project identification.

03

Installation and Commissioning Support

On-site or remote guidance during system installation, wiring verification, inverter configuration and first-power commissioning.

Responsibility window

Field Engineering

Submit via support form -- select Commissioning Support. Attach site photos and wiring diagrams.

04

Operating Issue

Fault diagnosis, alarm interpretation, performance degradation, communication failures and monitoring anomalies.

Responsibility window

After-Sales Service

Submit via support form -- select Operating Issue. Include model, serial number, alarm codes and logs.

05

Warranty and Service Ticket

Formal warranty claims, replacement part requests and scheduled maintenance coordination under service agreement.

Responsibility window

Service Operations

Submit via support form -- select Warranty or Service. Attach purchase documentation and photos.

06

Ongoing Operations and Maintenance

Periodic health checks, firmware update guidance, EMS configuration adjustments and long-term performance monitoring.

Responsibility window

EMS and O&M Team

Contact your regional service representative or submit via support form.

Frequently asked questions

Quick answers before you contact us.

Which document version is current?

Every document in the library displays a version number and publish date. The most recent version is marked "Current." Documents that have been replaced are marked "Superseded" and remain accessible for reference but should not be used for new installations. Always verify the model number and publish date before using a document.

Can I request controlled drawings or protocol specifications?

Yes. Controlled drawings, communication protocol specifications and other restricted-distribution materials can be requested through the support form. Select "Document Request" as the inquiry type and include your project identification. A non-disclosure agreement may be required for certain materials.

Where do I find the battery and inverter compatibility information?

Use the verified Battery-Inverter Compatibility List available in the Featured Downloads section. This list is updated with each firmware release and includes the minimum firmware version required for each pairing. Do not rely on general product family names alone; verify by exact model number.

How do I submit a service or fault issue?

Use the Support Form on this page and select "Operating Issue" or "Warranty / Service Ticket" as the inquiry type. Include the product model, serial number, installation site, a description of the issue, any alarm codes or log files, and photographs of the installation and fault condition. Complete information reduces diagnosis time significantly.

What is the expected response time for support requests?

Response times are defined by service region and the terms of your supply or service agreement. We do not publish generic SLA commitments on this page because they vary by contract and geography. Your regional contact or the support team will confirm the applicable response commitment when your ticket is acknowledged.

Are public datasheets available without registration?

Yes. Product datasheets, brochures, installation manuals and the compatibility list are available for direct download without account registration. Controlled drawings, commercial agreements and restricted protocols require project identification or a non-disclosure agreement.

How do I verify that a certificate applies to my specific unit?

Use the Certification Matrix on this page. Filter by product model, target market and certification standard. Each entry shows the certificate number, issuing body, the legal entity holding the certificate, the applicable model scope and the validity date. If your unit is not listed, contact the support team with your model and serial number.

Is client project data and serial number information kept confidential?

Yes. Serial numbers, site information and project drawings submitted through the support form are used only for the purpose of addressing your request and are not shared publicly or with third parties outside of the service delivery process. Review the privacy notice on the support form for full details.

Technical support request

Send your request to the right team.

Complete the fields below. More detail means faster resolution. Serial numbers and site information are kept confidential.

Drag and drop files here, or browse to upload

Accepted formats: PDF, JPG, PNG, DOC, DOCX, XLS, XLSX, ZIP -- max 10 MB per file

Do not upload confidential client drawings without first confirming the applicable non-disclosure arrangement with the MOLETONG team.

Fields marked * are required. Response times are defined by service region and agreement terms.

Submitting...

Technical support

Cannot Find the Exact Document or Answer?

If the document you need is not listed, the certificate scope is unclear, or you have a technical question that requires engineering input, the support team is the right next step.

Technical Sales

Pre-sales, sizing and compatibility

sales@moletong.com

Engineering

Controlled documents and protocols

engineering@moletong.com

Indonesia Projects

EaaS eligibility and project support

projects@moletong.com

Ready to build your energy system?

Whether you're evaluating residential backup, C&I peak management or a utility-scale storage plant, our engineering team starts with your site constraints--not a product catalogue.

Response time

1-2 days

Engineering review of project details

Founded

2011

Dongguan, Guangdong, China

Production

01 base

Integrated R&D and manufacturing

Sales network

04 hubs

Domestic centers + Indonesia office